Projects

We develop our projects technically and commercially.

Home / Projects

Projects

We handle implementation, commissioning and training

Home / Projects

Projects

We develop our projects technically and commercially.

Home / Projects

Projects

We handle implementation, commissioning and training

Home / Projects

Projects

We develop our projects technically and commercially.

Home / Projects

Projects

We handle implementation, commissioning and training

Home / Projects

Projects

We develop our projects technically and commercially.

Home / Projects

Center for Agricultural Horticultural Development

Country: Senegal

Sector: Agro-industry

Final client : Ministry of Agriculture

Finish date: 10/03/2014


The turnkey operation project consists of the construction of a horticultural plant with a cold store in a plot and one slaughterhouse in another, in the town of Mpal, near Saint-Louis (Senegal). The project aims at main goal to ensure self-sufficiency in food supply through the implementation of a comprehensive project that allows to offer adequate time, quantity and quality fresh products to the final customer, thus reducing dependence on imports from foreign countries.
 

CENTRAL HORTICULTURE

Four rectangular-shaped buildings have been built, with the following measurements (7,525 m² in total):

  • Packinghouse: 75 m x 40 m
  • Refrigerating warehouse: 100 m x 40 m
  • Office centre: 25 m x 15 m
  • Complex of buildings for facilities

 

SLAUGHTERHOUSE

The slaughterhouse with a line of slaughter of cattle and small ruminants (sheep and goats), each with a capacity of killing of 10 animals per hour. With service of 8 hours per day and 300 days of work a year, each line of the slaughterhouse has a capacity of slaughter of 24,000 heads per year.

The box of sacrifice is pneumatic and is made to carry out the slaughter according to Islamic Ritual (Halal).

Installation of cold rooms :

  • Fast-cooling for half carcasses. Room temperature: - 5 ºC.
  • Airing cold room for half carcasses. Airing and an initial mellowing of the meat are produced in this room. Temperature + 0 ºC.
  • Cold room for aging the meat on shelves and for preserving the refrigerated products for marketing fresh. Temperature + 0 ºC.
  • Air blast freezer with a capacity of 2,500 kg/day of meat. Temperature – 40 ºC.
  • Room for frozen products with a capacity of preserving about 25,000 kg of frozen meat. Temperature – 25 ºC
     

FACILITIES

In addition to the General facilities of the buildings (force and lighting, air conditioning, plumbing and sanitation, lightning, firefighting, etc.) a series of special installations were assembled: machinery, refrigeration facilities, steam, compressed air, gas oil, purification of wastewater, centers of transformation, generating sets, scale trucks. Additionally, various means of transportation and maintenance, such as forklifts and refrigerated trucks were delivered.
Fomento acts as a subcontractor designated for the project, developed with the main provider work together to design the scope, supply, installation and starting up, technical, training and maintenance of hospital medical equipment services. 

Purchasing of Raw Materials for Steel Industry - Foto

Wednesday, june 6, 2012

Purchasing of Raw Materials for Steel Industry

Negotiation and logistics for the purchase of steel for the Aceralia steel group...

Fish Quality Control Laboratories (KE) - Foto

Saturday, june 24, 2017

Fish Quality Control Laboratories (KE)

Construction and equipment of three laboratories ...

50 Mw Hoima  Thermal Power Plant Project - Foto

Saturday, june 3, 2023

50 Mw Hoima Thermal Power Plant Project

Construction and operation of a 50 MW multi-fuel thermal power plant....